ENGINEERING STUDY AND CONSULTANCY SERVICES
▪ Various Risk Assessment (Pipeline, Pressurized Equipment, Structure, Tank, Lifting Equipment, Rotating Equipment, Electrical Equipment)
▪ Risk Based Inspection (RBI)
▪ Reliability Centered Maintenance (RCM)
▪ Asset Integrity Management System (AIMS)
▪ Equipment Criticality Assessment (ECA)
▪ Fitness for Services (FFS).
▪ Remining Life Assessment (RLA).
▪ Structure Life Extension (SLE).
▪ Re-Engineering.
▪ HAZOP/ HAZID Study.
▪ RAMS Study.
▪ Safety/ Security Analysis.
▪ Piping Stress Analysis
▪ Root Cause Failure Analysis
▪ Engineering and Design Review ▪ etc
Risk Based Inspection (RBI), Reliability Centered Maintenance (RCM), Asset Integrity Management
Pipelines, Pressure Vessel (PV), Pressure Safety Valve (PSV), Platform, Installation, Lifting Equipment, Electrical Equipment, Rot...
Long Range Ultrasonic Testing (LRUT), Time of Flight Diffraction (TOFD), Phased Array (PA), Pulse Eddy Current (PEC)